Period of Works: April-August, 2016
Customer: Northern Capital Highway Ltd.
General Contractor: ICA Construction

The works realized:
Roadway Slab Installation of Sections No. 1 and No. 3
During this period 20 000 m3 of concrete were poured with the density of reinforced concrete amounting to 350 kg/m? and the total area of 110 000 m2. Installation of embedded parts was performed for installation of the lighting masts, barrier and bridge railings and water drainage funnels to remove water from the roadway of the bridge.
The works were carried out at the height of 40 m.